Skip to content

Patel Engineering shares locked at upper circuit on LoA for water tunnel project

Patel Engineering has been awarded the LOA from City and Industrial Development Corporation (CIDCO) for the construction of a 6.70 km long treated water tunnel and associated works from Sai Village to Vindhane Village in Raigad District of Maharashtra.

Read More

​ Patel Engineering has been awarded the LOA from City and Industrial Development Corporation (CIDCO) for the construction of a 6.70 km long treated water tunnel and associated works from Sai Village to Vindhane Village in Raigad District of Maharashtra. Patel Engineering has been awarded the LOA from City and Industrial Development Corporation (CIDCO) for the construction of a 6.70 km long treated water tunnel and associated works from Sai Village to Vindhane Village in Raigad District of Maharashtra.  Moneycontrol Latest News Read More  

Leave a Reply

Your email address will not be published. Required fields are marked *

en_USEnglish