Skip to content

Suzlon bags 300 MW wind energy project from Torrent Power

Suzlon will install 100 wind turbine generators with a hybrid lattice tubular tower and a rated capacity of 3 MW each. The project is located in Karnataka and expected to be commissioned in 2025.

Read More

​ Suzlon will install 100 wind turbine generators with a hybrid lattice tubular tower and a rated capacity of 3 MW each. The project is located in Karnataka and expected to be commissioned in 2025. Suzlon will install 100 wind turbine generators with a hybrid lattice tubular tower and a rated capacity of 3 MW each. The project is located in Karnataka and expected to be commissioned in 2025.  Moneycontrol Latest News Read More  

Leave a Reply

Your email address will not be published. Required fields are marked *

en_USEnglish