Skip to content

Remove construction, demolition waste at twin towers site, Noida Authority tells Edifice Engineering

Edifice Engineering has also been directed to complete the repair work of the boundary wall of (the adjoining housing complex) ATS Village that was damaged during the demolition on August 28 by October 15, 2022, as per the original design and material.

Read More

Leave a Reply

Your email address will not be published. Required fields are marked *

en_USEnglish