{"id":63383,"date":"2023-07-11T11:40:36","date_gmt":"2023-07-11T06:10:36","guid":{"rendered":"http:\/\/finservwealth.com\/suzlon-bags-47-6mw-wind-energy-project-from-kp-group\/"},"modified":"2023-07-11T11:40:36","modified_gmt":"2023-07-11T06:10:36","slug":"suzlon-bags-47-6mw-wind-energy-project-from-kp-group","status":"publish","type":"post","link":"https:\/\/finservwealth.com\/hi\/suzlon-bags-47-6mw-wind-energy-project-from-kp-group\/","title":{"rendered":"Suzlon bags 47.6MW wind energy project from KP Group"},"content":{"rendered":"<p> The project is located at Vagra in Bharuch district in Gujarat and is expected to be commissioned in 2024, a company statement said. A project of this size can provide electricity to 36,000 households and curb 1.42 lakh tonne of CO2 emissions per year.<\/p><div id=\"finse-4150578165\" class=\"finse-content finse-entity-placement\"><script async src=\"\/\/pagead2.googlesyndication.com\/pagead\/js\/adsbygoogle.js?client=ca-pub-9118214110898834\" crossorigin=\"anonymous\"><\/script><ins class=\"adsbygoogle\" style=\"display:block;\" data-ad-client=\"ca-pub-9118214110898834\" \ndata-ad-slot=\"\" \ndata-ad-format=\"auto\"><\/ins>\n<script> \n(adsbygoogle = window.adsbygoogle || []).push({}); \n<\/script>\n<\/div>\n<p><a href=\"https:\/\/www.moneycontrol.com\/news\/business\/suzlon-bags-476mw-wind-energy-projectkp-group_17108171.html\" target=\"_blank\" class=\"feedzy-rss-link-icon\" rel=\"noopener\">Read More<\/a><\/p>\n<p>\u200b\u00a0The project is located at Vagra in Bharuch district in Gujarat and is expected to be commissioned in 2024, a company statement said. A project of this size can provide electricity to 36,000 households and curb 1.42 lakh tonne of CO2 emissions per year. The project is located at Vagra in Bharuch district in Gujarat and is expected to be commissioned in 2024, a company statement said. A project of this size can provide electricity to 36,000 households and curb 1.42 lakh tonne of CO2 emissions per year.\u00a0\u00a0Moneycontrol Latest News\u00a0<a href=\"https:\/\/www.moneycontrol.com\/news\/business\/suzlon-bags-476mw-wind-energy-projectkp-group_17108171.html\" target=\"_blank\" class=\"feedzy-rss-link-icon\" rel=\"noopener\">Read More<\/a>\u00a0\u00a0<\/p>","protected":false},"excerpt":{"rendered":"<p><!-- wp:html --><\/p>\n<p> The project is located at Vagra in Bharuch district in Gujarat and is expected to be commissioned in 2024, a company statement said. A project of this size can provide electricity to 36,000 households and curb 1.42 lakh tonne of CO2 emissions per year.<\/p>\n<p><a href=\"https:\/\/www.moneycontrol.com\/news\/business\/suzlon-bags-476mw-wind-energy-projectkp-group_17108171.html\" target=\"_blank\" class=\"feedzy-rss-link-icon\" rel=\"noopener\">Read More<\/a><\/p>\n<p>\u200b\u00a0The project is located at Vagra in Bharuch district in Gujarat and is expected to be commissioned in 2024, a company statement said. A project of this size can provide electricity to 36,000 households and curb 1.42 lakh tonne of CO2 emissions per year. The project is located at Vagra in Bharuch district in Gujarat and is expected to be commissioned in 2024, a company statement said. A project of this size can provide electricity to 36,000 households and curb 1.42 lakh tonne of CO2 emissions per year.\u00a0\u00a0Moneycontrol Latest News\u00a0<a href=\"https:\/\/www.moneycontrol.com\/news\/business\/suzlon-bags-476mw-wind-energy-projectkp-group_17108171.html\" target=\"_blank\" class=\"feedzy-rss-link-icon\" rel=\"noopener\">Read More<\/a>\u00a0\u00a0<\/p>\n<p><!-- \/wp:html --> The project is located at Vagra in Bharuch district in Gujarat and is expected to be commissioned in 2024, a company statement said. A project of this size can provide electricity to 36,000 households and curb 1.42 lakh tonne of CO2 emissions per year.<\/p>","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"content-type":"","_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"neve_meta_sidebar":"","neve_meta_container":"","neve_meta_enable_content_width":"","neve_meta_content_width":0,"neve_meta_title_alignment":"","neve_meta_author_avatar":"","neve_post_elements_order":"","neve_meta_disable_header":"","neve_meta_disable_footer":"","neve_meta_disable_title":"","_themeisle_gutenberg_block_has_review":false,"footnotes":""},"categories":[70],"tags":[],"class_list":["post-63383","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-latest-news"],"jetpack_featured_media_url":"https:\/\/www.moneycontrol.com\/news_image_files\/2022\/200x200\/S\/Suzlon-wind-farm-Gujarat_200.jpg","_links":{"self":[{"href":"https:\/\/finservwealth.com\/hi\/wp-json\/wp\/v2\/posts\/63383","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/finservwealth.com\/hi\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/finservwealth.com\/hi\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/finservwealth.com\/hi\/wp-json\/wp\/v2\/comments?post=63383"}],"version-history":[{"count":0,"href":"https:\/\/finservwealth.com\/hi\/wp-json\/wp\/v2\/posts\/63383\/revisions"}],"wp:attachment":[{"href":"https:\/\/finservwealth.com\/hi\/wp-json\/wp\/v2\/media?parent=63383"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/finservwealth.com\/hi\/wp-json\/wp\/v2\/categories?post=63383"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/finservwealth.com\/hi\/wp-json\/wp\/v2\/tags?post=63383"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}