छोड़कर सामग्री पर जाएँ

Remove construction, demolition waste at twin towers site, Noida Authority tells Edifice Engineering

  • द्वारा
  • Latest News

Edifice Engineering has also been directed to complete the repair work of the boundary wall of (the adjoining housing complex) ATS Village that was damaged during the demolition on August 28 by October 15, 2022, as per the original design and material.

Read More

प्रातिक्रिया दे

आपका ईमेल पता प्रकाशित नहीं किया जाएगा. आवश्यक फ़ील्ड चिह्नित हैं *

hi_INहिन्दी